Generator Automatic Transfer Switch Installation
This make a grea.
Generator automatic transfer switch installation. This guide will explain the two different types of transfer switches so you can feel confident you re choosing the best switch to keep your essential appliances running during a power outage. Each time the generator kicks on a diagnostic signal is sent via the internet to the homeowner and electrician. It is also shows the working and operation for different changeover switches wiring connections like single phase manual changeover switch with generator three phase manual transfer switch connection with generator as well as single phase and three phase automatic transfer switches connections to the 1 and 3 phase generators and main fuse board. It sends electricity into the house when the power goes out and the generator kicks on.
How to install a generac transfer switch step 1. Call your local codes office to make sure it is legal for you to install your own transfer switch. Pre wired for the easiest and least expensive installation on the market they are an excellent value when whole house coverage is unnecessary. A generator transfer switch closes off the utility power line to your home s electrical system during a power outage and opens a line to a generator then reverses the process when grid power is restored.
A transfer switch is installed beside the electrical meter. Lift the transfer switch up to the wall where it is to be installed and label the placement of the mounting screws. To avoid possible injury that might be caused by such sudden start ups the system s automatic start circuit must be disabled before working on or around the generator or transfer switch. Mount the transfer switch.
When an automatic transfer switch is installed for a standby generator set the generator engine may crank and start at any time without warning. I complete the installation of the generac 11kw standby generator and automatic transfer switch. Place the generator in its permanent location outside and near the electrical meter. Test your work by first starting up the portable generator.
Once you are sure that everything is working as it should flip back the transfer switch. The transfer switch should be placed roughly 1 1 2 feet 45 72 cm away from the midpoint of the main circuit breaker. And with the power to the house still turned off at the main electrical panel plug the generator into the outdoor receptacle. Simply turn on the generator and flip transfer switch.
12 affix the transfer switch to the wall using mounting screws. Any electronics that you have connected should receive power. Generac s pre wired switch is an automatic transfer switch and distributed load center that backs up selected circuits for essential circuit coverage.